Our Plants

We believe that true value generation is when we seek the reduction of environmental impacts and a sustainable development where our partners, customers and society all win. In this sense, diversification of sources is essential.

Tour plants validate our focus on clean and sustainable energy: we have hydraulic, solar and wind power sources in our energy matrix.

All our stations will be remotely operated by our Power Generation Operations Center, located in Bauru, in the state of São Paulo.

We are a global reference in asset management, and in 2013 we were elected the first company to receive the PAS 55 certification – International Asset Management Certification – in Latin America.

Find out more about our Asset Management Policy:

Política de Gestão de Ativos

Certificado ISO55001-2014

Barueri
Água Vermelha
Bahia
Bauru
Bariri
Barra Bonita
Boa Hora
Caconde
Euclídes da Cunha
Ibitinga
Limoeiro
Mogi Guaçu
Promissão
Nova Avanhandava
São Joaquim
São José
  • Barueri

    We are presente in the day to day of the lives of millions of Brazilians and we know the importance of our mission which is to supply solutions of safe and sustainable energy for everyone.

    Currently we have one distribution company – AES Eletropaulo, two generation companies – AES Tietê and AES Uruguaiana, and one service company – AES Ergos.

  • Água Vermelha

    Official Name: José Ermínio de Moraes HPP

    Installed Power: 1,396,200 kW

    Power per Generation Unit: 232,700 kW

    Go-live: August 22, 1978

    Operation Method: Remote Operation via COGE (GU-1 and 2) / Local (GU-3, 4, 5 and 6)

    Dispatch Method: Dispatched by ONS

    Watercourse: Grande River

    Hydrographic Basin: Paraná River

    Address: Rod. Percy Valdir Semeghini, km 66 – Ouroeste (SP)

    Reservoir Length: 174 km

    Reservoir Operation: Accumulation

    Normal Maximum Volume: 11,025 106 m³

    Usable Volume: 5,169 106 m³

    Dam Type: Mixed (Soil/Concrete)

    Dam Length: 3,940 m

    Maximum Usable Quota : 383.3 m

    Minimum Usable Quota : 373.3 m

    Nominal Head: 57 m

    Surface Spillway: 8 gates of 2,481 m³/s = Total 19,848 m³/s

    Bottom Spillway: Not applicable

    Spillway – Other: Not applicable

    Turbine Type: Vertical axis Francis type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 440 kV

    Number of Locks: None

    Locking Capacity: Not applicable

  • Bahia

    Location
    Caetité, Guanambi, Igaporã e Pindaí

    Installed Power
    386,1 MW

    Quantity of Aerogenerators
    230

    Number of Parks
    15

  • Bauru

    Real time

    Responsible for all of the operational processes of the hydraulic, electric, and energetic system. The basic activities are done by ONS (National Electric System Operator) and by AES Tietê.

    Pre-operation

    Responsible for the Programming of Intervention for Maintenance with the goal of optimizing outages and maximizing the plants’ availability.

    Energetic Programming

    Responsible for the optimization of the electric and energetic operation of the plants, guaranteeing the operational security of people and equipments, attending existing restrictions and procedures of NOS.

    Post-operation

    Responsible for the data, analysis, evaluation, statistics, as well as taking care of the operations’ results, with the goal of cycling all operative processes.

    Normatization

    Responsible for the Instructions, Manuals, Routines, Norms, Regulation, and Unifilar Diagrams, where procedures and necessary indicators for the operation are defined

  • Bariri

    Official Name: Álvaro de Sousa Lima HPP

    Installed Power: 143,100 kW

    Power per Generation Unit: 47,700 kW

    Go-live: October 25, 1965

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by ONS via COGE

    Watercourse: Tietê River

    Hydrographic Basin: Paraná River

    Address: Rod. Bariri/Boracéia, km 12 – Boracéia (SP)

    Reservoir Length: Reservoir: 63 km² area and 607 x 106 m³ volume

    Reservoir Operation: Run-of-River

    Normal Maximum Volume: 607 x 106 m³

    Usable Volume: 60 x 106 m³

    Dam Type: Mixed (Soil/Concrete)

    Dam Length: 856.25 m

    Maximum Usable Quota : 427.50 m

    Minimum Usable Quota : 426.50 m

    Nominal Head: 24 m

    Surface Spillway: 6 gates of 431 m³/s = Total 2,856 m³/s

    Bottom Spillway: 2 gates of 853 m³/s = Total 1,706 m³/s

    Spillway – Other: Not applicable

    Turbine Type: Vertical axis Kaplan type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 138 kV

    Number of Locks: 1

    Locking Capacity: 10 million ton/year

  • Barra Bonita

    Official Name: Barra Bonita HPP

    Installed Power: 140,760 kW

    Power per Generation Unit: 35,190 kW

    Go-live: May 20, 1963

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by ONS via COGE

    Watercourse: Tietê River

    Hydrographic Basin: Paraná River

    Address: Rod. Jaú/São Manoel s/n – Barra Bonita (SP)

    Reservoir Length: 150 km

    Reservoir Operation: Accumulation

    Normal Maximum Volume: 3622 x 106 m³

    Usable Volume: 2,566 x 106 m³/s

    Dam Type: Concrete

    Dam Length: 480 m

    Maximum Usable Quota : 451.50 m

    Minimum Usable Quota : 439.50 m

    Nominal Head: 23.5 m

    Surface Spillway: 5 gates of 906 m³/s = Total 4,530 m³/s

    Bottom Spillway: Not applicable

    Spillway – Other: Not applicable

    Turbine Type: Vertical axis Kaplan type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 138 kV

    Number of Locks: 1

    Locking Capacity: 10 million ton/year

  • Boa Hora

    Total Projected Capacity of 91 MWp (75 MWca)

    Status: in construction

  • Caconde

    Official Name: Caconde HPP

    Installed Power: 80,400 kW

    Power per Generation Unit: 41,200 kW (GU1) and 39.200 kW (GU2)

    Go-live: August 22, 1966

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by ONS via COGE

    Watercourse: Pardo River

    Hydrographic Basin: Paraná River

    Address: Rod. Caconde-Divinolândia, km 293 – Caconde (SP)

    Reservoir Length: 57 km

    Reservoir Operation: Run-of-River

    Normal Maximum Volume: 555 x 106 m³

    Usable Volume: 504 x 106 m³

    Dam Type: Soil

    Dam Length: 640 m

    Maximum Usable Quota: 855 m

    Minimum Usable Quota: 825 m

    Nominal Head: 105 m

    Surface Spillway: 2 gates of 426 m³/s = Total 852 m³/s

    Bottom Spillway: 1 gate of 200 m³/s

    Spillway – Other: 1 free spillway (Tulipa) of 726 m³/s

    Turbine Type: Vertical axis Francis type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 138 kV

    Number of Locks: Not applicable

    Locking Capacity: Not applicable

  • Euclídes da Cunha

    Official Name: Euclídes da Cunha HPP

    Installed Power: 108,800 kW

    Power per Generation Unit: 27,200 kW

    Go-live: December 7, 1960

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by ONS via COGE

    Watercourse: Pardo River

    Hydrographic Basin: Paraná River

    Address: Rod. Mococa/São José do Rio Pardo, km 5 – São José do Rio Pardo (SP)

    Reservoir Length: 8.20 km

    Reservoir Operation: Run-of-River

    Normal Maximum Volume: 13.35 x 106 m³

    Usable Volume: 4.68 x 106 m³

    Dam Type: Soil

    Dam Length: 312 m

    Maximum Usable Quota: 665.00 m

    Minimum Usable Quota: 659.50 m

    Nominal Head: 92 m

    Surface Spillway: 2 gates of 1,027 m³/s = Total 2,054 m³/s

    Bottom Spillway: Not applicable

    Spillway – Other: 1 free spillway (Tulipa) of 990 m³/s

    Turbine Type: Vertical axis Francis type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 138 kV

    Number of Locks: Not applicable

    Locking Capacity: Not applicable

  • Ibitinga

    Official Name: Ibitinga HPP

    Installed Power: 131,490 kW

    Power per Generation Unit: 43,830 kW

    Go-live: April 20, 1969

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by ONS via COGE

    Watercourse: Tietê River

    Hydrographic Basin: Paraná River

    Address: Rodovia Cezário José de Castilho, km 407 – Ibitinga (SP)

    Reservoir Length: 76 km

    Reservoir Operation: Run-of-River

    Normal Maximum Volume: 981 x 106 m³

    Usable Volume: 56 x 106 m³

    Dam Type: Mixed (Soil/Concrete)

    Dam Length: 1,555.75 m

    Maximum Usable Quota: 404 m

    Minimum Usable Quota: 403.50 m

    Nominal Head: 24.30 m

    Surface Spillway: 7 gates of 343 m³/s = Total 2,401 m³/s

    Bottom Spillway: 3 gates of 693 m³/s = Total 2,079 m³/s

    Spillway – Other: Not applicable

    Turbine Type: Vertical axis Kaplan type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 138 kV

    Number of Locks: 1

    Locking Capacity: 10 million ton/year

  • Limoeiro

    Official Name: Armando Salles de Oliveira HPP

    Installed Power: 32,200 kW

    Power per Generation Unit: 16,100 kW

    Go-live: September 25, 1958

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by ONS via COGE

    Watercourse: Pardo River

    Hydrographic Basin: Paraná River

    Address: Rod. Casa Branca-Mococa, km 258 – Mococa (SP)

    Reservoir Length: 7 km

    Reservoir Operation: Run-of-River

    Normal Maximum Volume: 25.16 x 106 m³

    Usable Volume: 16.36 x 106 m³

    Dam Type: Soil

    Dam Length: 600 m

    Maximum Usable Quota: 577.5 m

    Minimum Usable Quota: 563 m

    Nominal Head: 25.5 m

    Surface Spillway: 2 gates of 882 m³/s = Total 1,764 m³/s

    Bottom Spillway: Not applicable

    Spillway – Other: 2 supplementary surface gates of 610 m³/s = Total 1,220 m³/s

    Turbine Type: Vertical axis Kaplan type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 138 kV

    Number of Locks: Not applicable

    Locking Capacity: Not applicable

  • Mogi Guaçu

    Official Name:Mogi Guaçu SHP

    Installed Power:7,200 kW

    Power per Generation Unit:3,600 kW

    Go-live:October 30, 1994

    Operation Method:Remote Operation via COGE

    Dispatch Method:Dispatched by COGE

    Watercourse:Mogi Guaçu River

    Hydrographic Basin:Paraná River

    Address: Municipal Mogi Guaçu/ Cachoeira de Cima, s/n, Km 3,6, Mogi Guaçu – SP

    Reservoir Length:21 km

    Reservoir Operation:Run-of-River

    Normal Maximum Volume:46 x 106 m³

    Usable Volume:08 x 106 m³

    Dam Type:Soil

    Dam Length:150 m

    Maximum Usable Quota:50 m

    Minimum Usable Quota:596 m

    Nominal Head:6 m

    Surface Spillway:4 gates of 524.8 m³/s = Total 2,099 m³/s

    Bottom Spillway:Not applicable

    Spillway – Other:Not applicable

    Turbine Type:Horizontal axis synchronous

    Generator Type:Kaplan Tubular S

    Rated voltage of SE:8 kV

    Number of Locks:Not applicable

    Locking Capacity:Not applicable

  • Promissão

    Official Name: Mário Lopes Leão HPP

    Installed Power: 264,000 kW

    Power per Generation Unit: 88,000 kW

    Go-live: July 28, 1975

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by ONS via COGE

    Watercourse: Tietê River

    Hydrographic Basin: Paraná River

    Address: Rod. Br 153, km 139 – Promissão – SP

    Reservoir Length: 125 km

    Reservoir Operation: Accumulation

    Normal Maximum Volume: 7,408 x 106 m³

    Usable Volume: 2,128 x 106 m³

    Dam Type: Mixed (Soil/Concrete)

    Dam Length: 3,630 m

    Maximum Usable Quota: 384 m

    Minimum Usable Quota: 379.7 m

    Nominal Head: 27.4 m

    Surface Spillway: Not applicable

    Bottom Spillway: 5 gates of 1,336 m³/s = Total 6,680 m³/s

    Spillway – Other: Not applicable

    Turbine Type: Vertical axis Kaplan type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 138 kV

    Number of Locks: 1

    Locking Capacity: 10 million ton/year

  • Nova Avanhandava

    Official Name: Rui Barbosa HPP

    Installed Power: 347,400 kW

    Power per Generation Unit: 115,800 kW

    Go-live: September 13, 1982

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by ONS via COGE

    Watercourse: Tietê River

    Hydrographic Basin: Paraná River

    Address: Rod. SP 461, km 44 – Buritama – SP

    Reservoir Length: 55 km

    Reservoir Operation: Run-of-River

    Normal Maximum Volume: 2,720 x 106 m³

    Usable Volume: 380 x 106 m³

    Dam Type: Mixed (Soil/Concrete)

    Dam Length: 2,038 m

    Maximum Usable Quota : 358 m

    Minimum Usable Quota : 356 m

    Nominal Head: 29.7 m

    Surface Spillway: 4 gates of 1,987 m³/s = Total 7,948 m³/s

    Bottom Spillway: Not applicable

    Spillway – Other: Not applicable

    Turbine Type: Vertical axis Kaplan type

    Generator Type: Vertical axis Umbrella type

    Rated voltage of SE: 138 kV

    Number of Locks: 2

    Locking Capacity: 10 million ton/year

  • São Joaquim

    Official Name: São Joaquim SHP

    Installed Power: 3,013 kW

    Power per Generation Unit: 3,013 kW

    Go-live: Go-live in 2011

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by COGE

    Watercourse: Jaguari-Mirim River

    Hydrographic Basin: Paraná River

    Address: Estrada Velha São João da Boa Vista / Vargem Grande do Sul, Km 14, São João da Boa Vista – SP

    Reservoir Length: Shorter than 1 km

    Reservoir Operation: Run-of-River

    Normal Maximum Volume: Not applicable

    Usable Volume: Not applicable

    Dam Type: Concrete

    Dam Length: 57.3 m

    Maximum Usable Quota: 658.32 m

    Minimum Usable Quota: 658.32 m

    Nominal Head: 15.82 m

    Surface Spillway: Not applicable

    Bottom Spillway: Not applicable

    Spillway – Other: Free Sill – 717.92 m³/s Labyrinth

    Turbine Type: Horizontal axis synchronous

    Generator Type: Kaplan (Tubular S)

    Rated voltage of SE: 13.8 kV

    Number of Locks: Not applicable

    Locking Capacity: Not applicable

  • São José

    Official Name: São José SHP

    Installed Power: 4,600 kW

    Power per Generation Unit: 2,800 kW

    Go-live: March 17, 2013

    Operation Method: Remote Operation via COGE

    Dispatch Method: Dispatched by COGE

    Watercourse: Jaguari-Mirim River

    Hydrographic Basin: Paraná River

    Address: Estrada Velha São João da Boa Vista / Vargem Grande do Sul, Km 04, São João da Boa Vista – SP

    Reservoir Length: Shorter than 1 km

    Reservoir Operation: Run-of-River

    Normal Maximum Volume: Not applicable

    Usable Volume: Not applicable

    Dam Type: Concrete

    Dam Length: 122.20 m

    Maximum Usable Quota: 709.80 m

    Minimum Usable Quota: 709.80 m

    Nominal Head: 23.80 m

    Surface Spillway: Not applicable

    Bottom Spillway: Not applicable

    Spillway – Other: Free Sill – 655.91 m³/s Labyrinth

    Turbine Type: Synchronous

    Generator Type: Kaplan (Tubular S)

    Rated voltage of SE: 13.8 kV

    Number of Locks: Not applicable

    Locking Capacity: Not applicable